By the general public about the reliability of the system, taipower chose to avoid major projects that could be submitted for inspection, and only faced it with a non-existing normative attitude. How could it convince the public? In february 2019, taipower finally admitted to the outside world that the instrument and control equipment is the first in the world and is incompatible with other units, and some parts have been discontinued, making it difficult to obtain spare parts.
If it is decided to restart nuclear iv now, it will be a long way to pass the safety inspection of the instrumentation and control system. How will the nuclear camp ensure that the power supply of nuclear energy can be on the road as scheduled? And Illustrator Art Work if the government strongly leads the safety inspection and acceptance, how can the quality of its certification ensure the safety of nuclear power? The empty cheque to restart the nuclear 4th is the special medicine for every election of the blue camp, but how can it be completed on schedule? How to ensure safety? Every time I choose to say it, in the end, I can only bounce the vote.
Resolute disposal measures have almost become the main card for nuclear groups to ensure nuclear safety. The so-called decisive disposal will achieve the purpose of cooling the furnace core through a motorized power supply, multiple timely water injection measures and staged pressure relief. Since it may eventually lead to the failure of the power plant to resume operation in the future, it is known as the last checkpoint as a safety barrier. However, the "Raw water pool", an important facility for decisive disposal measures, was built on the "Slope".